Below you can see jobs we have carried out ourselves — leaks, drain unblocking, roofing and pipework in Almere, Amsterdam and the surrounding towns. All the photos are of our own work. No stock images, no examples from someone else.

For each job we describe what the problem was, what we found and how we solved it. We mention the town, but of course not the address.

Feel free to send us a photo on WhatsApp first — that way we can often assess the problem straight away.

Klusbedrijf MSZ engineer working on water pipes next to a 5/5 Werkspot rating from 225+ reviews

5.0 on Werkspot

225+ reviews

Available 24/7

Nights and weekends too

Registered with the KvK

KvK 87844508

Family business

From Almere, since 2022

Prices up front

No surprises

  • LEAKS AND PIPEWORK

Leak in the wall traced and repaired

A leaking water pipe in the wall. The wall was only opened up at the spot of the leak, and the damaged section of pipe was replaced with new copper.

Wall chiselled open to reveal an old water pipe, with the leak circled in marker

Leak marked

Find the spot first, and only then open up further.

New section of copper water pipe with couplings in the opened-up wall, after the leak was fixed

New copper pipe

The damaged section replaced, ready to be closed up.

  • DRAIN UNBLOCKING AND SEWERS

Sewer pipe laid and paving put back

The front garden was dug up for a new sewer pipe along the front of the house. Once the pipe was laid, the paving bricks were put back.

Grey PVC sewer pipes with bends in a dug-out trench along a brick façade

Trench along the façade

The front garden dug up.

Grey PVC sewer pipes with a bend and a connection in an excavated trench

PVC pipe laid

Bends and connection in the trench.

Paving bricks being relaid in front of a house, with a block splitter in the background

Paving back in

The paving is relaid.

Newly laid brick paving in front of a house

A neat finish

The front garden is neat and tidy again.

  • MAINTENANCE

Mouldy shower sealant replaced

Black mould in the sealant of a shower. Not sealed over: the old sealant was first removed completely and then replaced with new sanitary sealant.

Black mould and dirt in the sealant of a shower corner next to the glass screen

Mould in the sealant

Black build-up in the corner by the glass screen.

Old, dirty sealant in a shower corner being removed with a knife

Old sealant out

Removed completely, not sealed over.

Shower corner with new white sealant, black floor tiles and a square drain

New sealant

Neatly sealed around the floor and walls.

  • ROOFING

Vent pipes fitted through a tiled roof

New vent pipes through a roof with ceramic roof tiles, next to the dormer. First fitted on the roofing membrane, then the roof was retiled.

Three black vent pipes on orange roofing membrane between the red roof tiles

Vent outlets on the membrane

Tiles temporarily removed, vents fitted.
Dormer with windows on a roof with red roof tiles, above a brick façade

Roof closed again

Tiles back on, vents through the roof.
 
  • DRAIN UNBLOCKING AND SEWERS

Drain by the façade dug up and renewed

The ground along the façade was dug out down to the drain. The old pipe was lying in a pit full of water. There is now a new PVC drain, connected to the pipe coming out of the house.

Old grey drainpipe with a bend and T-piece dug up next to a dark façade, in a pit of water
New grey PVC drain with bends, a T-piece and a capped upstand in a dug-out pit along the façade
  • MAINTENANCE

Façade by the basement: from loose render to natural stone

The render was coming loose on both sides of a basement window. In both places we fitted a dark grey natural stone panel, neatly sealed with a white joint.

Section of façade next to a basement window with loose render and exposed reinforcing mesh, before the repair
The same section of façade after the repair: a dark grey natural stone panel, sealed all round with a white sealant joint
Before After

The render was coming loose and the reinforcing mesh was exposed. Now: a natural stone panel, sealed all round.

Damaged section of façade below a cracked windowsill, with loose render and reinforcing mesh, before the repair
Second section of façade next to the basement window, finished with a dark grey natural stone panel and a white sealant joint
Before After

Loose render below a cracked windowsill. Now: the same natural stone and finish.

  • BATHROOM, TOILET AND KITCHEN

Toilet with a mosaic strip and concrete-look walls

The pink walls and old wall tiles made way for concrete-look walls with a vertical strip of mosaic. Finished with a black toilet, a black cloakroom basin and gold-coloured accessories.

Toilet room during tiling: a vertical strip of mosaic tiles with tile levelling clips against the back wall

Mosaic tiling

The strip is kept straight with tile levelling clips.

Renovated toilet room with a black toilet, a vertical mosaic strip and concrete-look walls

Black toilet

Mosaic strip, concrete look and a pendant light.

Black hand basin with a gold-coloured tap, gold-coloured toilet roll holder and ventilation grille in the renovated toilet room

Cloakroom basin

Black cloakroom basin with a gold-coloured tap.

  • ELECTRICS

Old fuse box replaced with a new consumer unit

A meter cupboard with old screw-in fuses and a separate main switch. The old box was taken out, and the new consumer unit was connected and covered.

New consumer unit in the meter cupboard, connected but without its cover yet

Old fuse box

Screw-in fuses and a separate main switch.

Meter cupboard with a wooden back panel after the old box was removed; the wiring is ready

Old box out

The wiring is ready for the new unit.

New consumer unit in the meter cupboard, connected but without its cover yet

Connecting

All circuits connected, cover still off.

New consumer unit with a grey cover in a meter cupboard with a wooden back panel

Covered

The new unit, closed and clearly laid out.

  • ELECTRICS

From porcelain fuses to a new consumer unit

A black box with porcelain screw-in fuses and a single RCD for some of the circuits. The old box was removed and replaced with a new consumer unit.

Old black fuse box with porcelain screw-in fuses and an RCD, before replacement

Porcelain fuses

Old black box with screw-in fuses.

Meter cupboard with the old fuse box removed; the wires are ready above the meter

Old box gone

The wires are ready above the meter.

New consumer unit with RCDs, circuit breakers and an energy management module, without its cover yet

New consumer unit

Neatly wired, with RCDs.

  • BEFORE AND AFTER

The same spot, before and after

On the left how we found it, on the right how we left it.

Floor-standing toilet under a sloping ceiling, before the renovation to a wall-hung toilet
Wall-hung toilet with flush plate against a natural-stone-effect wall panel, under a sloping ceiling
Before After

Toilet under a sloping ceiling

From an old floor-standing toilet to a wall-hung toilet with a concealed cistern and a sleek wall panel.

Old bathroom with mould on the shower floor before renovation
Renovated bathroom with a walk-in shower and vanity unit
Before After

Bathroom: from mould to new

A shower room full of mould, replaced with a walk-in shower with a glass screen and a new vanity unit.

Toilet floor and wall before the new floor coating was applied
Finished epoxy floor around a wall-hung toilet
Before After

Epoxy toilet floor

From a dirty subfloor to a seamless flake floor that is easy to keep clean.

Mould around the radiator connection caused by damp
The radiator connection after the damp problem was fixed
Before After

Damp damage by the radiator

Mould and damp around a radiator connection. The cause was fixed and the connection left clean.

Old consumer unit without a cover, with loose wiring at the top, before replacement
New consumer unit with a cover and circuit labels above the electricity meter
Before After

Old consumer unit replaced

An open box with loose wiring at the top, replaced with a new consumer unit with a cover and circuit labels.

New consumer unit in a meter cupboard next to wooden shelves, while being connected
Covered new consumer unit in a meter cupboard next to wooden shelves
During After

Consumer unit next to the shelves

In a cramped meter cupboard: first the new unit was wired, then neatly covered.